English

Resources

Home » FAQ » Other Common Questions

Other Common Questions

  • Q Can you provide samples? What is the sample cost and time?

    A Yes, we can provide samples. The sample cost is calculated according to the product specifications (the cost of conventional samples is 1.5-2 times the unit price of batch orders). The sample production time is 7-10 days, and the sample shipping cost is borne by the customer. If a batch order is placed later, the sample cost can be deducted from part of the payment.
  • Q How to confirm whether the quality of the transformer meets the requirements?

    A We have established a strict quality control system. Each transformer will undergo comprehensive testing before leaving the factory, including ratio and vector group test, DC resistance test, no-load and load loss test, AC withstand voltage test, etc., and provide Chinese and English test reports; customers can also arrange personnel to conduct on-site witness testing (FAT) in the factory to ensure that the product quality meets the agreed standards.
  • Q How to avoid the risk of customs inspection when exporting transformers?

    A We will make declarations in accordance with customs requirements, accurately classify HS codes (under 8504), truthfully declare goods information (such as dangerous goods such as insulating oil), prepare complete customs clearance documents in advance to ensure that documents are consistent with each other and with goods; at the same time, standardize goods packaging and hoisting reinforcement, retain relevant operation image data, and establish export compliance ledgers to minimize the risk of customs inspection and avoid goods detention, fines or return due to violations.
The Group's core businesses cover high-end manufacturing and industrial fields such as chemical products, transformers, and electrical equipment, with transformers and other electrical equipment being the Group's strategic leading industries.

PRODUCTS

QUICK LINKS

CANTACTS

 Tel: +86-18353911563
 Add: Building 1, Jigao Cloud Data Center, Shunhua Road Subdistrict, Lixia District,   
Jinan City, Shandong Province
 Opening Hours: 
work every day 9:00–17:00
Copyright © 2026 Shandong Future Electric Co., Ltd. All Rights Reserved.
Privacy Policy            Sitemap