Author: Site Editor Publish Time: 2026-08-24 Origin: Site
Project Nature: External power supply supporting project for a large-scale data center. An outdoor step-down substation is newly constructed outside the park, undertaking power intake and distribution for the 10kV medium-voltage power distribution system.
Construction Site: Syria
Equipment Scale: 14 sets of outdoor oil-immersed power transformers
Core Equipment: S13-M-2000/10 three-phase oil-immersed transformer with 10kV/0.4kV voltage ratio, Dyn11 vector group, secondary energy efficiency grade and ONAN cooling mode.
Project Stage: All equipment has been installed and positioned. Cable laying and wiring construction are in progress. Handover test and official commissioning are expected to be completed within 2–3 months.
Project Highlights: Multi-unit grouped standby power configuration, dust-proof membrane protection for equipment until power transmission, standardized cable trench laying, and enhanced lightning protection & grounding design for mountainous areas.
Project Significance: Adopt a high-reliability and high-efficiency power supply solution to ensure the continuous and stable operation of the date center.